System Test 2 - 24th October (GENT)
This was a test of the Manual Call Point and the two-stage alert/alarm system. The signal one alert stage was configured to last 30 seconds before proceeding to signal two alarm. This test featured the following components:
- NANO-24 Control Panel (NANO-24)
- S4 Manual Call Point (S4-34805)
- S3 Voice Sounder / Red VAD (S3-V-VAD-HPR-R)
System Test 1 - 18th July (GENT)
This was a test of the Manual Call Point and the two-stage alert/alarm system. The signal one alert stage was configured to last one minute before proceeding to signal two alarm. This test featured the following components:
- NANO-24 Control Panel (NANO-24)
- S4 Manual Call Point (S4-34805)
- S3 Voice Sounder / Red VAD (S3-V-VAD-HPR-R)
- S4 Dual Optical Heat Sensor / Voice Sounder (S4-711-V-VAD-LPR)