The Fire Lab: System Tests 2024

Tests of the Fire Lab equipment

MCP and Two-stage Test - 18th July (GENT)

This was a test of the Manual Call Point and the two-stage alert/alarm system. The signal one alert stage was configured to last one minute before proceeding to signal two alarm. This test featured the following components:

  • NANO-24 Control Panel (NANO-24)
  • S4 Manual Call Point (S4-34805)
  • S3 Voice Sounder / Red VAD (S3-V-VAD-HPR-R)
  • S4 Dual Optical Heat Sensor / Voice Sounder (S4-711-V-VAD-LPR)